The plant builds chemical pumps with a high share of 316L. Certificates were checked but composition was not, and one corrosion complaint traced back to 304 tube with almost no molybdenum.
Solution: Q4 spark OES, three tubes sampled per incoming batch, two sparks each after grinding, giving Cr/Ni/Mo/C in 40 seconds against the grade specification, with samples retained on failure.
Result: the first verification rejected 12 t of tube sold as 316L (0.02% Mo, 8.1% Ni) and the supplier replaced it in full; with routine incoming spectrometry, material-related complaints fell to zero and annual quality cost dropped about CNY 600k.




