Sending samples to the central lab took 15 minutes round trip while the furnace idled hot.
Solution: a floor-standing TY-9620 on the melt platform with plumbed argon, two-point type standardisation each shift; sample → ground face → 18-element result in 90 s.
Result: trimming laps down 65%, out-of-spec rejects from 0.8% to 0.2%, and about ¥96 k/month saved in alloy and power.




