Bài kỹ thuật644 lượt xem

Nghiệm thu theo ISO 10360-7: bố trí điểm đo và đánh giá E và P

E đo theo căn mẫu 5 chiều dài × 7 vị trí × 3 lần; P dùng cầu chuẩn 25 điểm; tất cả phải nằm trong MPE.

华旋光电技术部
Nghiệm thu theo ISO 10360-7: bố trí điểm đo và đánh giá E và P

What the acceptance items mean

ISO 10360-7 defines two acceptance indicators for vision coordinate measuring machines: the length measurement error E (variants such as E150) and the imaging probing error P evaluated with a reference sphere. E reflects the whole dimensional chain — scales, distortion correction, edge extraction; P reflects single-point probing repeatability and consistency. The machine passes only when both comply.

Point layout for E

Use a step gauge or a graduated glass scale with uncertainty no more than one third of the MPE. Arrange seven measurement positions — four body diagonals of the working volume plus three axial or symmetric positions per the maker's specification — with five lengths at each, the longest at least 66 percent of the measuring-space diagonal and the shortest down to pixel-scale lengths. Three runs per position and length give 105 readings. Criterion: every |indication minus reference| within MPE(E), for example ±(3.0+L/250) μm.

Performing P

Take a reference sphere of 10 to 30 mm diameter with roundness within 0.5 μm. Image its equatorial contour at 25 evenly distributed points across the field, fit a least-squares circle, and take the maximum range of radial residuals as P. On machines that stitch multiple fields, repeat the test across stitching boundaries — stitching is a characteristic weak point of vision machines.

Organization and dispute handling

Environment first: 20±1 °C or per contract, gradient below 1 °C/h, adequate vibration isolation, and at least two hours of warm-up. Standards must carry valid traceable certificates. A failed first acceptance permits one adjustment — distortion recalibration, scale compensation — followed by one retest; persistent failure leads to rejection or downgraded acceptance per contract. Record software version and compensation parameters in the report, because a version change can alter the error behavior, and the report becomes the comparison baseline for annual reverification.

⇄0So sánhSo sánh thông số